CO Inspection – Not Required
Sewer Lateral Inspection - Required
Moving Permit – Required
CO Inspection – Required ($100 Fee) / Re-inspection ($100 Fee)
Sewer Lateral Inspection - Not Required
Moving Permit – Not Required
CO Inspection – Required ($150 Fee) / Re-inspection ($75 Fee)
Sewer Lateral Inspection - Not Required
Moving Permit – Required ($20 Fee)
CO Inspection – Not Required
Sewer Lateral Inspection - Not Required
Moving Permit – Not Required
CO Inspection – Not Required
Sewer Lateral Inspection - Required
Moving Permit – Required ($25 Fee)
CO Inspection – Required ($80 Fee) / Re-inspection ($50 Fee)
Sewer Lateral Inspection - Not Required
Moving Permit – Required ($5 Fee)
CO Inspection – Not Required
Sewer Lateral Inspection - Required
Moving Permit – Required ($1 Fee)
CO Inspection – Not Required
Sewer Lateral Inspection - Required
Moving Permit – Required (No Fee)
CO Inspection – Not Required
Sewer Lateral Inspection - Not Required
Moving Permit – Required ($5 Fee)
CO Inspection – Not Required
Sewer Lateral Inspection - Not Required
Moving Permit – Required (No Fee)
CO Inspection – Not Required
Sewer Lateral Inspection - Required
Moving Permit – Required (No Fee)
CO Inspection – Not Required
Sewer Lateral Inspection - Not Required
Moving Permit – Not Required
CO Inspection – Not Required
Sewer Lateral Inspection - Not Required
Moving Permit – Required (No Fee)
CO Inspection – Not Required
Sewer Lateral Inspection - Not Required
Moving Permit – Required (No Fee)
CO Inspection – Required ($95 Fee)
Sewer Lateral Inspection - Not Required
Moving Permit – Required ($10 Fee)
CO Inspection – Not Required
Sewer Lateral Inspection - Not Required
Moving Permit – Required (No Fee)
CO Inspection – Not Required
Sewer Lateral Inspection - Required
Moving Permit – Required ($10 Fee)
CO Inspection – Not Required
Sewer Lateral Inspection - Not Required
Moving Permit – Required ($10 Fee)
CO Inspection – Not Required
Sewer Lateral Inspection - Not Required
Moving Permit – Required (No Fee)
CO Inspection – Not Required
Sewer Lateral Inspection - Required
Moving Permit – Required ($1 Fee)
CO Inspection – Not Required
Sewer Lateral Inspection - Not Required
Moving Permit – Required (No Fee)
CO inspection – Not Required
Sewer Lateral Inspection - Required
Moving Permit – Not Required
CO Inspection – Not Required
Sewer Lateral Inspection - Not Required
Moving Permit – Required (No Fee)
CO Inspection – Not Required
Sewer Lateral Inspection - Not Required
Moving Permit – Required (No Fee)
CO Inspection – Required ($100 Fee)
Sewer Lateral Inspection - Not Required
Moving Permit – Required ($5 Fee)
CO Inspection – Not Required
Sewer Lateral Inspection - Not Required
Moving Permit – Required ($10 Fee)
CO Inspection – Required ($80 Fee)
Sewer Lateral Inspection - Not Required
Moving Permit – Required ($5 Fee)
CO Inspection – Not Required
Sewer Lateral Inspection - Not Required
Moving Permit – Required (No Fee)
CO Inspection – Required ($150 Fee) / Re-inspection ($75 Fee)
Sewer Lateral Inspection - Not Required
Moving Permit – Required ($5 Fee)
CO Inspection – Required ($100 Fee) / Re-inspection ($50 Fee)
Sewer Lateral Inspection - Not Required
Moving Permit – Required ($3 Fee)
CO Inspection – Not Required
Sewer Lateral Inspection - Not Required
Moving Permit – Required ($5 Fee)
CO Inspection – Not Required
Sewer Lateral Inspection - Not Required
Moving Permit – Required ($1 Fee)
CO Inspection – Required ($100 Fee)
Sewer Lateral Inspection - Not Required
Moving Permit – Required ($20 Fee)
CO Inspection – Required ($150 Fee) / Re-inspection ($100 Fee)
Sewer Lateral Inspection - Not Required
Moving Permit – Required ($25 Fee)
CO Inspection – Not Required
Sewer Lateral Inspection - Not Required
Moving Permit – Required (No Fee)
CO Inspection – Required ($96 Fee) / Re-inspection ($84 Fee)
Sewer Lateral Inspection - Not Required
Moving Permit – Required ($35 Fee)
CO Inspection – Not Required
Sewer Lateral Inspection - Not Required
Moving Permit – Required ($10 Fee)
CO Inspection – Required ($150 Fee) / Re-inspection ($75 Fee)
Sewer Lateral Inspection - Not Required
Moving Permit – Required (No Fee)
CO Inspection – Not Required
Sewer Lateral Inspection - Not Required
Moving Permit – Required ($5 Fee)
CO Inspection – Not Required
Sewer Lateral Inspection - Not Required
Moving Permit – Required ($5 Fee)
CO Inspection – Not Required
Sewer Lateral Inspection - Not Required
Moving Permit – Required ($10 Fee)
CO Inspection – Not Required
Sewer Lateral Inspection - Not Required
Moving Permit – Required ($5 Fee)
CO Inspection – Not Required
Sewer Lateral Inspection - Not Required
Moving Permit – Required ($5 Fee)
CO Inspection – Not Required
Sewer Lateral Inspection - Not Required
Moving Permit – Required ($10 Fee)
CO Inspection – Not Required
Sewer Lateral Inspection - Not Required
Moving Permit – Not Required
CO Inspection – Required ($75 Fee) / Re-inspection ($70 Fee)
Sewer Lateral Inspection - Not Required
Moving Permit – Required ($1 Fee)
CO Inspection – Not Required
Sewer Lateral Inspection - Not Required
Moving Permit – Required ($10 Fee)
CO Inspection – Not Required
Sewer Lateral Inspection - Not Required
Moving Permit – Required ($5 Fee)
CO Inspection – Required ($75 Fee)
Sewer Lateral Inspection - Not Required
Moving Permit – Required ($5 Fee)
CO Inspection – Not Required
Sewer Lateral Inspection - Not Required
Moving Permit – Required (No Fee)
CO Inspection – Not Required
Sewer Lateral Inspection - Not Required
Moving Permit – Required (No Fee)
CO Inspection – Required ($135 Fee)
Sewer Lateral Inspection - Not Required
Moving Permit – Required ($5 Fee)
CO Inspection – Required ($100 Fee)
Sewer Lateral Inspection - Not Required
Moving Permit – Required ($5 Fee)
CO Inspection – Not Required
Sewer Lateral Inspection - Required
Moving Permit – Required ($5 Fee)
CO Inspection – Not Required
Sewer Lateral Inspection - Required
Moving Permit – Required ($2 Fee)
CO Inspection – Not Required
Sewer Lateral Inspection - Required
Moving Permit – Required ($10 Fee)
CO Inspection – Not Required
Sewer Lateral Inspection - Required
Moving Permit – Required ($5 Fee)
CO Inspection – Not Required
Sewer Lateral Inspection - Required
Moving Permit – Required ($1 Fee)
CO Inspection – Required ($70 Fee) / Re-inspection ($70 Fee)
Sewer Lateral Inspection - Not Required
Moving Permit – Required ($5 Fee)
CO Inspection – Not Required
Sewer Lateral Inspection - Required
Moving Permit – Required ($5 Fee)
CO Inspection – Required ($150 Fee)
Sewer Lateral Inspection - Not Required
Moving Permit – Required ($5 Fee)
CO Inspection – Not Required
Sewer Lateral Inspection - Not Required
Moving Permit – Required ($5 Fee)
CO Inspection – Required ($60 Fee)
Sewer Lateral Inspection - Not Required
Moving Permit – Not Required
CO Inspection – Required ($75 Fee)
Sewer Lateral Inspection - Not Required
Moving Permit – Not Required
CO Inspection – Not Required
Sewer Lateral Inspection - Required
Moving Permit – Required (No Fee)
CO Inspection – Required ($100 Fee) / Re-inspection ($40 Fee)
Sewer Lateral Inspection - Not Required
Moving Permit – Not Required
CO Inspection – Not Required
Sewer Lateral Inspection - Required
Moving Permit – Not Required
CO Inspection – Not Required
Sewer Lateral Inspection - Required
Moving Permit – Required (No Fee)
CO Inspection – Not Required
Sewer Lateral Inspection - Not Required
Moving Permit – Not Required
CO Inspection – Required ($85 Fee) / Re-inspection ($100 Fee)
Sewer Lateral Inspection – Required
Moving Permit – Not Required
CO Inspection – Required ($100 Fee)
Sewer Lateral Inspection - Required
Moving Permit – Not Required
CO Inspection – Required ($50 Fee) / Re-inspection ($50 Fee)
Sewer Lateral Inspection – Not Required
Moving Permit – Not Required
CO Inspection – Not Required
Sewer Lateral Inspection - Not Required
Moving Permit – Required (No Fee)
CO Inspection – Not Required
Sewer Lateral Inspection - Required ($100 Fee)
Moving Permit – Required (No Fee)
CO Inspection – Required ($125 Fee)
Sewer Lateral Inspection - Required
Moving Permit – Not Required
CO Inspection – Required ($150 Fee) / Re-inspection ($75 Fee)
Sewer Lateral Inspection – Not required
Moving Permit – Required ($5 Fee)
CO Inspection – Required ($100 Fee)
Sewer Lateral Inspection - Not Required
Moving Permit – Not Required
CO Inspection – Required ($150 Fee)
Sewer Lateral Inspection - Not Required
Moving Permit – Not Required
CO Inspection – Not Required
Sewer Lateral Inspection - Required
Moving Permit – Not Required
CO Inspection – Required ($50 Fee)
Sewer Lateral Inspection – Not Required
Moving Permit – Not Required
CO Inspection – Not Required
Sewer Lateral Inspection - Not Required
Moving Permit – Required ($10 Fee)
CO Inspection – Not Required
Sewer Lateral Inspection – Required
Moving Permit – Not Required
CO Inspection – Not Required
Sewer Lateral Inspection - Required
Moving Permit – Required (No Fee)
CO Inspection – Not Required
Sewer Lateral Inspection - Not Required
Moving Permit – Not Required
CO Inspection – Required ($150 Fee)
Sewer Lateral Inspection - Not Required
Moving Permit – Not Required
CO Inspection – Not Required
Sewer Lateral Inspection - Not Required
Moving Permit – Not Required
CO Inspection – Not Required
Sewer Lateral Inspection - Not Required
Moving Permit – Not Required
CO Inspection – Required ($120 Fee)
Sewer Lateral Inspection – Required
Moving Permit – Required ($5 Fee)
CO Inspection – Required ($100 Fee)
Sewer Lateral Inspection - Required
Moving Permit – Not Required
CO Inspection – Required ($140 Fee)
Sewer Lateral Inspection - Not Required
Moving Permit – Not Required
CO Inspection – Required ($200 Fee)
Sewer Lateral Inspection - Not Required
Moving Permit – Not Required
CO Inspection – Required ($80 Fee)
Sewer Lateral Inspection - Not Required
Moving Permit – Not Required
CO Inspection – Required ($100 Fee)
Sewer Lateral Inspection – Required
Moving Permit – Not Required
CO Inspection – Required ($75 Fee)
Sewer Lateral Inspection - Not Required
Moving Permit – Not Required
CO Inspection – Required ($75 Fee)
Sewer Lateral Inspection - Required
Moving Permit – Not Required
CO Inspection – Required ($50 Fee)
Sewer Lateral Inspection - Not Required
Moving Permit – Not Required
CO Inspection – Not Required
Sewer Lateral Inspection - Required
Moving Permit – Required (No Fee)
CO Inspection – Required ($75 Fee)
Sewer Lateral Inspection – Required
Moving Permit – Not Required
CO Inspection – Required ($100 Fee)
Sewer Lateral Inspection - Not Required
Moving Permit – Not Required
CO Inspection – Required ($100 Fee)
Sewer Lateral Inspection - Not Required
Moving Permit – Not Required
CO Inspection – Required ($150 Fee)
Sewer Lateral Inspection - Not Required
Moving Permit – Not Required
CO Inspection – Required ($100 Fee)
Sewer Lateral Inspection - Required
Moving Permit – Not Required
CO Inspection – Required ($125 Fee)
Sewer Lateral Inspection - Not Required
Moving Permit – Not Required
CO Inspection – Required ($200 Fee)
Sewer Lateral Inspection - Not Required
Moving Permit – Not Required
CO Inspection – Required ($75 Fee)
Sewer Lateral Inspection – Required
Moving Permit – Required ($5 Fee)
CO Inspection – Required ($80 Fee) / Re-inspection ($45 Fee)
Sewer Lateral Inspection – Required
Moving Permit – Not Required
CO Inspection – Not Required
Sewer Lateral Inspection - Not Required
Moving Permit – Not Required
CO Inspection – Not Required
Sewer Lateral Inspection – Not Required
Moving Permit – Not Required
CO Inspection – Required ($125 Fee)
Sewer Lateral Inspection - Not Required
Moving Permit – Not Required
CO Inspection – Not Required
Sewer Lateral Inspection - Not Required
Moving Permit – Not Required
CO Inspection – Not Required
Sewer Lateral Inspection – Not Required
Moving Permit – Not Required
CO Inspection – Not Required
Sewer Lateral Inspection - Not Required
Moving Permit – Not Required
CO Inspection – Required ($100 Fee)
Sewer Lateral Inspection - Not Required
Moving Permit – Not Required
CO Inspection – Not Required
Sewer Lateral Inspection - Not Required
Moving Permit – Not Required
CO Inspection – Not Required
Sewer Lateral Inspection - Not Required
Moving Permit – Not Required
CO Inspection – Required ($65 Fee) / Re-inspection ($25 Fee)
Sewer Lateral Inspection – Not Required
Moving Permit – Required (No Fee)
CO Inspection – Not Required
Sewer Lateral Inspection - Not Required
Moving Permit – Not Required
CO Inspection - Not Required
Sewer Lateral Inspection - Not Required
Moving Permit – Not Required
CO Inspection - Not Required
Sewer Lateral Inspection - Required
Moving Permit – Not Required
CO Inspection – Not Required
Sewer Lateral Inspection - Not Required
Moving Permit – Not Required
CO Inspection – Required
Sewer Lateral Inspection - Not Required
Moving Permit – Not Required
CO Inspection – Not Required
Sewer Lateral Inspection - Not Required
Moving Permit – Not Required
CO Inspection – Not Required
Sewer Lateral Inspection - Not Required
Moving Permit – Not required
CO Inspection – Not Required
Sewer Lateral Inspection - Not Required
Moving Permit – Not Required
CO Inspection – Not Required
Sewer Lateral Inspection – Not Required
Moving Permit – Not Required
CO Inspection – Not Required
Sewer Lateral Inspection - Not Required
Moving Permit – Not Required
CO Inspection – Required ($75 Fee)
Sewer Lateral Inspection – Not Required
Moving Permit – Not Required
CO Inspection – Not Required
Sewer Lateral Inspection - Not Required
Moving Permit – Not Required
CO Inspection – Required ($175 Fee)
Sewer Lateral Inspection - Not Required
Moving Permit – Not Required
CO Inspection – Not Required
Sewer Lateral Inspection - Not Required
Moving Permit – Not Required
CO Inspection – Not Required
Sewer Lateral Inspection - Not Required
Moving Permit – Not Required
CO Inspection – Not Required
Sewer Lateral Inspection - Not Required
Moving Permit – Not Required
CO Inspection – Required
Sewer Lateral Inspection – Required
Moving Permit – Not Required
CO Inspection – Required ($125 fee)
Sewer Lateral Inspection - Required
Moving Permit – Not Required
CO Inspection – Not Required
Sewer Lateral Inspection - Not Required
Moving Permit – Not Required
CO Inspection – Not Required
Sewer Lateral Inspection - Not Required
Moving Permit – Not Required
CO Inspection – Not Required
Sewer Lateral Inspection – Required
Moving Permit – Required
CO Inspection – Required ($40 Fee)
Sewer Lateral Inspection - Not Required
Moving Permit – Not Required
CO Inspection – Required ($90 Fee)
Sewer Lateral Inspection - Not Required
Moving Permit – Not Required
CO Inspection – Not Required
Sewer Lateral Inspection - Not Required
Moving Permit – Not Required
CO Inspection – Not Required
Sewer Lateral Inspection - Not Required
Moving Permit – Not Required
CO Inspection – Not Required
Sewer Lateral Inspection - Not Required
Moving Permit – Not Required
CO Inspection – Not Required
Sewer Lateral Inspection - Not Required
Moving Permit – Not Required
CO Inspection – Not Required
Sewer Lateral Inspection – Not Required
Moving Permit – Not Required
CO Inspection – Not Required
Sewer Lateral Inspection - Not Required
Moving Permit – Not Required
CO Inspection – Required ($100 Fee) / Re-inspection ($75 Fee)
Sewer Lateral Inspection - Not Required
Moving Permit – Not Required
CO Inspection – Not Required
Sewer Lateral Inspection - Not Required
Moving Permit – Not Required
CO Inspection – Required ($50 Fee)
Sewer Lateral Inspection - Required
Moving Permit – Required ($5 Fee)
CO Inspection – Required ($87.50+ Fee)
Sewer Lateral Inspection – Not Required
Moving Permit – Not Required
CO Inspection – Not Required
Sewer Lateral Inspection - Not Required
Moving Permit – Not Required
CO Inspection – Required ($135 Fee)
Sewer Lateral Inspection - Required
Moving Permit – Not Required
CO Inspection – Not Required
Sewer Lateral Inspection - Not Required
Moving Permit – Not Required
CO Inspection – TBD
Sewer Lateral Inspection - Required
Moving Permit – TBD
CO Inspection – Required (Applicable only if vacant for 90+ days; fee of $80)
Sewer Lateral Inspection – Not Required
Moving Permit – Not Required
CO Inspection – Not Required
Sewer Lateral Inspection - Not Required
Moving Permit – Not Required
CO Inspection – Required (≥30 days, $230 fee, or ≤30 days, $275 Fee)
Sewer Lateral Inspection - Not Required
Moving Permit – Not Required
CO Inspection – Required ($125 Fee)
Sewer Lateral Inspection - Not Required
Moving Permit – Not Required
CO Inspection – Not Required
Sewer Lateral Inspection - Required
Moving Permit – Not Required
CO Inspection – TBD
Sewer Lateral Inspection - Not Required
Moving Permit – Required
CO Inspection – Not Required
Sewer Lateral Inspection - Not Required
Moving Permit – Not Required
CO Inspection – Not Required
Sewer Lateral Inspection – Not Required
Moving Permit – Not Required
CO Inspection – Not Required
Sewer Lateral Inspection – Not Required
Moving Permit – Not Required
CO Inspection – Not Required
Sewer Lateral Inspection - Not Required
Moving Permit – Not Required
CO Inspection – Not Required
Sewer Lateral Inspection – Required
Moving Permit – Not Required
CO Inspection – Required ($75 Fee)
Sewer Lateral Inspection - Not Required
Moving Permit – Not Required
CO Inspection – Not Required
Sewer Lateral Inspection - Not Required
Moving Permit – Not Required
CO Inspection – Not Required
Sewer Lateral Inspection – Not Required
Moving Permit – Not Required
CO Inspection – Required ($50 Fee)
Sewer Lateral Inspection - Required
Moving Permit – Not Required
CO Inspection – Not Required
Sewer Lateral Inspection - Not Required
Moving Permit – Not Required
CO Inspection – Not Required
Sewer Lateral Inspection - Not Required
Moving Permit – Not Required
CO Inspection – Not Required
Sewer Lateral Inspection – Not Required
Moving Permit – Not Required
CO Inspection – Not Required
Sewer Lateral Inspection - Not Required
Moving Permit – Not Required
CO Inspection – Not Required
Sewer Lateral Inspection – Not Required
Moving Permit – Not Required
CO Inspection – Not Required
Sewer Lateral Inspection - Not Required
Moving Permit – Not Required
CO Inspection – Required ($150 Fee)
Sewer Lateral Inspection - Required
Moving Permit – Not Required
CO Inspection – Not Required
Sewer Lateral Inspection – Not Required
Moving Permit – Not Required
CO Inspection – Not Required
Sewer Lateral Inspection - Not Required
Moving Permit – Not Required
CO Inspection – Not Required
Sewer Lateral Inspection – Required
Moving Permit – Required
CO Inspection – Not Required
Sewer Lateral Inspection - Not Required
Moving Permit – Not Required
CO Inspection – Required ($175 Fee) / Re-inspection ($80 Fee)
Sewer Lateral Inspection – Not Required
Moving Permit – Not Required
CO Inspection – Not Required
Sewer Lateral Inspection - Required
Moving Permit – Not Required
CO Inspection – Not Required
Sewer Lateral Inspection – Not Required
Moving Permit – Not Required
CO Inspection – Not Required
Sewer Lateral Inspection - Not Required
Moving Permit – Required ($5 Fee)
CO Inspection – Required ($75 Fee)
Sewer Lateral Inspection – Required
Moving Permit – Not Required
CO Inspection – Required ($150 Fee)
Sewer Lateral Inspection - Not Required
Moving Permit – Not Required
CO Inspection – TBD
Sewer Lateral Inspection – TBD
Moving Permit – TBD
CO Inspection – Required (≥14 days, $85 fee, or ≤14 days, $125 Fee)
Sewer Lateral Inspection - Not Required
Moving Permit – Not Required
CO Inspection – Required ($84 Fee)
Sewer Lateral Inspection – Not Required
Moving Permit – Not Required
Whether buying, selling, or investing, Witt Real Estate Group is here to guide you with unmatched expertise and personalized care. Contact us today to start the conversation and discover what makes us different.